Our Projects

The Tamora Group » Project

 

 

At The Tamora Group, we pride ourselves on the work that we have completed. Take a look at some of our recent projects.

42,000SF building with a 28’ clear height

3 Tun

70 Three Tun Road (Malvern PA) – This is a Butler pre-engineered metal building that is 42,000SF building with a 28’ clear height. This building includes (4) loading dock doors, an ESFR sprinkler system and 800amp service feed. It’s an ongoing project that is nearing completion of the building shell, and an interior fitout will be completed at a later date.

40,500SF Butler PEMB industrial space

Alliance HP

Alliance HP (Linwood PA) – Another 40,500SF Butler PEMB industrial space was completed for our repeat client Alliance HP. This project was ground up including an underground stormwater retention basin, Butler MR-24® roof system, Butler Shadowall™, ESFR sprinkler system and (6) loading dock doors. This project was completed in early 2023.

53,000SF addition to an existing building

Hillside

Hillside (Morgantown PA) – The Hillside Expansion project was challenging but exciting. It consisted of a 53,000SF addition to an existing building that included over 7,000SF of office space inside and a mezzanine for storage above. There was also an exterior covered loading dock that was also part of the Butler structure. Some of the other features included crane rails connected to the existing structure, a seamless roof transition between buildings, ESFR sprinkler system, heated sidewalk, (5) overhead doors, and interior dividing walls. It even required a helicopter to place the RTUs on the backside of the roof because of the difficult terrain around the building. This project was completed in early 2023.

~5,000SF of office space

Red Bull

Red Bull Distribution Company (Aston PA) – This tenant improvement project focused on renovating ~5,000SF of office space with new interior glass walls systems, polished concrete floor, a new kitchenette area, expanded the restrooms and updated all the finishes throughout the space. The warehouse area included; an epoxy basketball court, new loading dock leveling kits, and new LED high-bay lights. This renovation was completed in June of 2023.

5,000SF Butler PEMB Gymnasium Building

Warfel

Warfel Arcadia (Moosic PA) – This 5,000SF Butler PEMB Gymnasium Building was part of a large project at the Arcadia-Geisinger Behavior Health Hospital. This project utilized the MR-24® Standing Seam Metal Roofing System. This project was completed in May of 2023.

Military Hangar: 106,475 SQFT

McGuire Air Force Base

This $68.5 million design-build project provides a combined helicopter maintenance facility for the US Marines HMH-772 Squadron, Marine Aircraft Group Headquarters (MAG-49 HQ) and the U.S. Marines HMLA-775 Detachment A.

It encloses 106,475 SF and includes both Type I and Type II maintenance hangars. A two-story structure that runs the full width of the two hangars provides helicopter maintenance support shops, headquarters unit, administrative offices, and storage warehouses.

Façade Renovation

Glen Eagle Shopping Center

Originally designed and built in 1989-91 the Glen Eagle Shopping Center was ready for a new look. One of the most important aspects of the design was to introduce more visibility and natural light to the tenants under the existing canopy. This was achieved by removing the existing large balconies at the front façade. After demolition of the existing balconies, EIFS, and punched windows; new large span windows were added including a Juliet balcony at the second floor. A unique new feature is a custom ornamental metal structure that welcomes guests at the main entrances of Jos. A. Banks and Curries Hair Skin & Nails Salon. Also included as part of this renovation was the replacement of the concrete sidewalk and a new specialized Glen Eagle (GE) brick paver in-lay.

25,000 Sq. Ft. New Construction

TNT Fireworks

This 25,000 sqft warehouse and retail center was completed in 2014. This project utilized Butler Shadowall wall panel along with Butler MR-24 roofing system. This project can be seen while driving north on I-95 just past the Delaware – Pennsylvania border.

136,000 Sq. Ft. Office / Warehouse Manufacturing Facility

New Hudson Facades

This 136,000 sqft manufacturing is the crown jewel of the Linwood industrial complex. Utilized to create exterior facades for some of the most complex buildings in the country, this building was completed in 2015. This project features a large production area that includes multiple bridge cranes and a large overhead door. This building also includes significant office space for employees.

5,600 Sq. Ft. Retail

Urgent Care/ATI

This dual fit-out consists of both an ATI physical therapy center as well as an AFC Urgent Care. This project was completed in 2017 and can be seen while driving down Pennell Rd in Aston, PA. The design of this building incorporates Butler Pre-Engineered materials along with conventional building materials

56,000 Sq. Ft. – Flex Office Warehouse

Biotelemetry

Constructed with Butler Pre-Engineered materials, Biotelemetry utilizes vertical and horizontal metal panels as well as Butler MR-24 Roof System. This industrial space has multiple dock doors as well as luxurious office space.

81,200 sqft Pre-Engineered Metal Building

Tower Holdings Group

An 81,200-square-foot industrial project located in the northern suburbs of New York City. The building contains approximately 13,000 square feet of office space and 71,000 square feet of warehouse space. This project utilized Butler Shadowall along with the Butler MR-24 Metal Roof System

6,500 sqft Tenant Fit Out

X-Golf Chester Springs

Contact Form

"*" indicates required fields

Name*

Skip to content